五月天青色头像情侣网名,国产亚洲av片在线观看18女人,黑人巨茎大战俄罗斯美女,扒下她的小内裤打屁股

歡迎光臨散文網(wǎng) 會(huì)員登陸 & 注冊(cè)

飛行課程 Stage 3 - Aeronautical Decision Making

2023-07-12 13:00 作者:才疏學(xué)淺的市民李先生  | 我要投稿

Contents:

  1. Risk Management Using the 5Ps

  2. The ADM Process

  3. Accidents and Incidents

  4. SRM Concepts - PIC Responsibility

  5. SRM Concepts - Effective Communication

  6. SRM Concepts - Resource Use

  7. SRM Concepts - Workload Management

  8. SRM Concepts - Situational Awareness


1. Risk Management Using the 5Ps

  • 5P - Pilot, Passengers, Plane, Programming, and Plan

    • Identify risk factors by answering the questions on each checklist

    • Mitigate risks by modifying your plans of you answer No to any questions

    • Make an effective Go/No-Go decision. If you can not effectively mitigate all of the risks, make a No-Go decision

  • Pilot Checklist

Pilot Checklist
  • Passengers Checklist

Passengers Checklist
  • Plane Checklist

Plane Checklist
  • Programming Checklist

Programming Checklist
  • Plan Checklist

Plan Checklist 1
Plan Checklist 2
  • Using the 5P Check in Flight

    • Five decision points:

      • Before-Takeoff

      • Initial Cruise

      • Enroute Cruise

      • Descent

      • Before-Landing

    • Ask yourself these questions:

      • What's the situation?

      • What has changed since my Go/No-Go decision?

      • Is the risk associated with any changes acceptable?

      • What can I do to minimize risk?

      • How can I prioritize tasks?


2. The ADM Process

  • Making Effective Decisions Using the ADM Process

  • The ADM Process Characteristics

    • Helps you to determine and implement a course of action and to evaluate the outcome of the action during flight operations

    • Is essential to flight safety in both routine and emergency situations

    • Is performed effectively by applying single-pilot resource management (SRM) concepts

  • The ADM Process

    • Step 1. Recognize a Change

Step 1
  • Step 2. Define the Problem

Step 2
  • Step3. Choose a Course of Action

Step 3
  • Step 4. Implement Your Decision

Step 4
  • Step 5. Monitor the Outcome

Step 5


3. Accidents and Incidents

  • Poor Judgement Chain

  • Human Factors-Related Acident Causes

    • Causes of common human factors-related accidents in the primary accident categories:

      • Takeoff and Initial Climb - lack of awareness of the effects of density altitude on airplane performance and improper takeoff planning

      • Fuel Management - fuel exhaustion or failing to switch tanks

      • Weather - attempted VFR flight into IFR conditions

      • Maneuvering Flight - loss of control during slow flight or my striking wires, trees, or terrain when flying at low altitudes

      • Descent and Approach - disorientation at night or in IFR conditions

      • Landing - loss of directional control on the runway

Accidents and Phases of Flight


4. SRM Concepts - PIC Responsibility

  • Self Assessment

Self-Assessment
  • Hazardous Attitudes

Hazardous Attitudes
  • Crew Coordination

    • Designate pilot and copilot responsibilities for tasks such as ATC communication and taking control of the airplane in an emergency

    • Use the positive exchange of flight controls procedure to ensure that airplane control is transferred effectively

  • Countinuing Your Aviation Education

Aviation Education


5. SRM Concepts - Effective Communication

  • Radio Techniques to Avoid Errors:

    • When in doubt, verify instructions with ATC

    • Read back clearances

    • Do not assume that controller silence after a readback means verification. Ask the controller for a verbal confirmation

    • Be alert for similar call signs

    • Use your call signs to acknowledge transmissions - not a double click of the mic or "Roger"

  • Cockpit/Cabin Communication

    • Follow the sterile cockpit procedure

      • Eliminate nonessential conversation during taxi, takeoff, landing, and all flight operations

    • Perform briefings

      • Provide valuable safety information

      • Review procedures

      • Define roles and responsibilities

      • Encourage passengers to voice any questions or concerns during the flight

  • Communication Barriers

Communication Barriers

6. SRM?Concepts - Resource Use

  • Using Internal Resources Effectively

Using Internal Resources Effectively
  • Using External Resources Effectively

Using External Resources Effectively
  • Resource Knowledge

Resource Knowledge

7. SRM Concepts - Workload Management

  • Effective Checklist Use

Effective Checklist Use
  • Planning and Prioritization to Prevent Work Overload

Planning and Prioritization to Prevent Work Overload
  • Managing Equipment Workload

Managing Equipment Workload

8. SRM Concepts - Situational Awareness

  • Counteracting Obstacles to Maintaining Sutuational Awareness

Counteracting Obstacles to Maintaining Sutuational Awareness
  • Actions to Prevent CFIT

Actions to Prevent CFIT
  • SOP Elements

SOP Elements


飛行課程 Stage 3 - Aeronautical Decision Making的評(píng)論 (共 條)

分享到微博請(qǐng)遵守國家法律
华亭县| 新河县| 固原市| 杨浦区| 汉中市| 河北省| 新和县| 罗田县| 阜平县| 霍州市| 托克托县| 赤峰市| 吉木萨尔县| 浮梁县| 牟定县| 太仓市| 沾化县| 嘉峪关市| 洪雅县| 嘉善县| 淄博市| 古丈县| 尼勒克县| 昌邑市| 新丰县| 那曲县| 隆尧县| 霍邱县| 综艺| 长子县| 沭阳县| 太仆寺旗| 永新县| 新沂市| 恭城| 香港 | 吐鲁番市| 江陵县| 阳江市| 六枝特区| 绿春县|