五月天青色头像情侣网名,国产亚洲av片在线观看18女人,黑人巨茎大战俄罗斯美女,扒下她的小内裤打屁股

歡迎光臨散文網(wǎng) 會員登陸 & 注冊

Bratislava port eyes LNG terminal

2021-05-10 15:20 作者:_多言數(shù)窮  | 我要投稿

奧地利和斯洛伐克邊界,LNG 液化站,不知道Capacity, 2026年上

The idea is to produce LNG at a site on the river and use it for fueling river boats.? They will also fill LNG trucks for distribution inland.

One thing not mentioned in the article is where the gas is coming from that will be made into LNG.

---------------------

A liquefied natural gas (LNG) terminal,?which will cost approx €40 million,?is being built in a public port in Bratislava, Slovakia.

The development of the LNG terminal in the public port of Bratislava is currently in the preparation phase, the port informed in its statement.

The LNG terminal will be located on the main course of the Danube and will span 5,500 square metres.

The LNG terminal will consist of facilities for LNG production, for refueling of road tanks, for LNG storage, and for bunkering of ships.

By supporting the introduction of infrastructure for alternative fuels, the project wants to reduce greenhouse gas emissions and contribute to the greening of the port. This is a part of the EU plan to build the Rhine-Danube transport corridor, which aims to make transport greener.

The feasibility study published by the Slovak Republic’s Public Ports identifies the most suitable technology for the production and distribution of LNG for the port, based on a comparison of available technologies for liquefaction and storage of LNG on the market.

The construction is expected to begin next year, with completion expected in 2026.

Public Ports estimated the cost of building the terminal at around €40 million ($48.3 m) excluding VAT.


Bratislava port eyes LNG terminal的評論 (共 條)

分享到微博請遵守國家法律
泰来县| 电白县| 景泰县| 聂拉木县| 璧山县| 巴林右旗| 团风县| 苍梧县| 应城市| 内乡县| 巨野县| 康定县| 文成县| 高雄市| 固镇县| 平阴县| 澄江县| 桐梓县| 工布江达县| 柳州市| 祁门县| 海门市| 阜阳市| 漳平市| 苍梧县| 闻喜县| 岳普湖县| 栾川县| 上杭县| 珲春市| 龙井市| 沂南县| 沾益县| 连山| 胶南市| 南漳县| 双辽市| 三穗县| 凤山市| 玛纳斯县| 四川省|